Home About Business Cases News Contact

【Company News】—Offshore wind power jacket transportation project 300MW

 Date:2019/5/18 Hits:38

On May 14, 2019, our company used SPMT modular car combined with ro-ro on board, self-made specific equipment and lashing process, and adopted integral vertical delivery, which fully ensured the smooth completion of the project.

Project Features:
The foundation of the four-pile booster station with the largest structure in China, the equipment center of gravity is high, the vehicle can only be arranged at four points, and the support bracket needs to be designed. In order to meet the needs of offshore floating crane operations, the layout of the jacket needs to be accurate. Placement needs to be precise.


Maximum equipment size: L27.8m * B32.3m * H48.7m and weighs about 1800t

Vehicle input: 56 axes 4PPU


Next:Jiangsu Yongjie Engineering Logistics Co., Ltd. carried the first disproportionation heating furnace of the refining unit of Zhejiang Petrochemical Project and shipped smoothly
Serve with Heart, Create Value Together
Tel:18168360666
Contact

Contact:Mr. Huang

Email:huanghe@jsyjgcwl.com

Add:Room 1405, Aikang Mansion, No. 5, Binhe West Road, Yangshe Town, Zhangjiagang, Suzhou, Jiangsu, PRC

Mobile station

Official account

Copyright © 2023 Jiangsu Yongjie Special Equipment Co., Ltd. 备案号:苏ICP备2022035761号-1 苏公网安备32058202011991号