At the beginning of 2020, the situation of the new crown pneumonia epidemic brought obstacles to the resumption of work and production, and Jiangsu Yongjie Engineering Logistics Co., Ltd. insisted on grasping epidemic prevention and control with one hand and orderly resumption of work and production with the other. Ensure that epidemic prevention production is grasped at both hands and is not wrong. After the Spring Festival, the first large-scale project - Guodian Investment Binhai South H3 Sea Rising Pressure Station was successfully completed by ro-ro.
This project was reported by CCTV, which is gratifying and congratulatory, and has made a good start for the company's 2020!
At present, the epidemic prevention and control is still not over, the company will continue to fight the "epidemic", overcome difficulties, adhere to the close combination of epidemic prevention and control and on-site management, ensure the steady progress of each project, and lay a solid foundation for the successful completion of the annual work goals.
Winter will eventually pass, spring will come, let us work hard and struggle together to achieve the work goal of 2020!
Contact:Mr. Huang
Email:huanghe@jsyjgcwl.com
Add:Room 1405, Aikang Mansion, No. 5, Binhe West Road, Yangshe Town, Zhangjiagang, Suzhou, Jiangsu, PRC
Mobile station
Official account