Recently, the Jiangsu Yongjie project team passed on the good news again: the 3100T sea rising pressure station was successfully completed in ro-ro, challenging the rollover limit! Su Yongjie project team again transmitted good news: 3100T sea rising pressure station successfully completed ro-ro, challenging the rollover limit!
The RoRo operation transportation place of the sea rising pressure station project is in Xiamen Terminal, with a large slope on the ship, many obstacles on both sides, and very limited space, which has strict requirements for precise operation. The local government attached great importance to it, and hired an expert group to discuss and demonstrate the company's ro-ro plan in detail, and finally passed the expert review.
The project uses side ro-ro on the ship, and the load transfer requirements are high. Since the length of the modular car is larger than the width of the deck of the boat, the front of the car is suspended in the sea during the operation, and the difficulty of the project and the expertise of the Yongjie team are amazing.
This ro-ro overcame the problem of large tidal difference in the Xiamen sea, challenged the roll-off limit in the industry, and added another significant stroke to the successful transportation case of Jiangsu Yongjiehai rising pressure station!
Recent projects have been repeated one after another, and the boys on the SPMT team seem ordinary, but they have a resilient heart. Pampered and not surprised, just like going, with the most enthusiastic heart into every operation, to create a proud record. This is also the best interpretation of the spirit of Yongjie------- luck is extraordinary, reaching the top of the industry.
Contact:Mr. Huang
Email:huanghe@jsyjgcwl.com
Add:Room 1405, Aikang Mansion, No. 5, Binhe West Road, Yangshe Town, Zhangjiagang, Suzhou, Jiangsu, PRC
Mobile station
Official account